Back to Knowledge BaseTemplates

POA&M Clean Template: A Practical Guide You Can Actually Use

Create a clean, assessment-ready CMMC POA&M template. Learn key fields, structure, and best practices to track, prioritize, and close compliance gaps.

Published: September 25th, 2025By: CMMC Dashboard TeamLast updated: September 25th, 2025
CMMC CompliancePOA&M TemplateAudit Preparation

If you’re preparing for CMMC, your Plan of Actions and Milestones (POA&M) can either be your best friend or the reason you’re scrambling in front of assessors. The difference comes down to structure. A clean template makes sure every gap is tracked, prioritized, and closed with defensible evidence.

This guide shows you how to build an assessment-ready POA&M you can actually run with, not just file away.


What’s in a Clean POA&M

A solid POA&M template includes three parts:

  1. POA&M Sheet
    Fields assessors look for: control mapping, gap narrative, risk, owners, milestones, evidence, and closure data.

  2. Guidance Sheet
    Step-by-step instructions on how to fill it out, with the minimum required for assessment readiness.

  3. Built-in Validation
    Drop-down values for risk and status, percent complete indicators, and date flags for items due or overdue.


Example Structure

Here’s how a practical POA&M sheet might look in a spreadsheet:

FieldPurposeExample Entry
Practice_or_Control_IDMaps to CMMC practice or NIST 800-171 controlAC.L2-3.1.2
Assessment_Objectives_Not_MetExact deficiency“Failed to enforce MFA for remote admin accounts”
Gap NarrativePlain language explanation“Admins can connect via VPN with only username/password”
Risk RatingOverall risk (High/Med/Low)High
Likelihood / ImpactDrives scoring and prioritizationLikelihood = High, Impact = High
OwnerWho is accountableIT Security Manager
MilestonesSteps to fix with dates“MFA rollout complete by 11/30/25”
Compensating ControlsInterim protections“Admin access restricted to corporate laptops only”
Interim Risk Acceptance UntilFormal note if risk is accepted temporarily“12/31/25”
Acceptance CriteriaWhat “done” means“All admin accounts require MFA; test log shows enforcement”
Test Plan SummaryHow it will be verified“Attempt login without MFA, confirm failure”
Closure Evidence LocationWhere proof will liveSharePoint/CMMC Evidence/MFA Rollout/Final Test
StatusOpen, In Progress, ClosedIn Progress
% CompleteVisual progress tracker50%
Dates (Opened, Target, Closed)Timeframe managementOpened: 9/1/25, Target: 11/30/25

Why This Works for CMMC

  1. Direct Traceability – Every open item ties back to a CMMC practice, control, and unmet assessment objective.
  2. Risk-Based Prioritization – Scoring forces leadership to address the most serious issues first.
  3. Binary Closure – Acceptance criteria and planned evidence are set upfront, so closure isn’t subjective.
  4. Full Trace Chain – Links back to SSP sections, policies, tickets, and evidence repositories stay intact.

How to Use It Without Creating Chaos

  • One row per gap, no exceptions.
  • Write gaps in plain, non-jargon language first, then add technical detail.
  • Assign milestones with real owners and resources, not vague intentions.
  • Define acceptance criteria and evidence before you start fixing.
  • Never alter history, update plan fields only; keep the evidence trail immutable.
  • Review frequently and adjust priorities based on risk scores and deadlines.

Key Columns You’ll Care About Most

  • Practice_or_Control_ID + Assessment_Objectives_Not_Met → assessor’s fast path to your deficiencies.
  • Risk Rating, Likelihood, Impact → drives sequencing and budget allocation.
  • Compensating Controls + Interim Risk Acceptance Until → shows how you’re managing exposure until fixes are in place.
  • Acceptance Criteria + Test Plan + Evidence Location → eliminates “good enough” subjectivity.
  • Governance/SSP References → keeps every artifact aligned.

Bottom Line

A clean POA&M isn’t about making a pretty spreadsheet, it’s about operationalizing compliance. With the right fields, guidance, and validation built in, your POA&M becomes a living tool for risk management, not just a document for auditors.